Unit repaints
A unit repaint, day by day
A typical vacant one- or two-bedroom flat. Your estimate gives the days for your unit.
- 01Day 1
Step 1: Cover, patch and prep
Floors, fixtures and anything left in the unit are covered. Holes and cracks are filled, loose paint scraped, stains sealed.
Ends with a clean, patched, taped unit
- 02Day 2
Step 2: Prime and first coat
Patches and stains are primed, then ceilings and walls get their first coat.
Ceilings first, then walls
- 03Day 3
Step 3: Second coat and trim
Walls get their second coat. Baseboards, casings and doors are brushed.
Trim and doors in the sheen you chose
- 04Day 4
Step 4: Touch-ups and walk-through
Tape comes off, we touch up what the light shows, and you or your manager walk the unit with Aura.
A short list, closed the same day
Prep
What gets done before any paint
Prep is most of the work in a flat that has been rented a few times. This is what the estimate lists for each unit.
Fill nail holes, cracks and dents; skim bad patches
Scrape loose paint and sand the edges smooth
Spot-prime stains, patches and bare plaster
Caulk trim, baseboards and window frames
Mask outlets, hardware and floors
Cover everything left in the unit

Finishes
Premium paint, in sheens that wash and hold
The estimate names the product line and sheen for each surface. Ask for the data sheet.
Walls
Eggshell or matte, in the color you pick or an off-white we keep for turns.
Ceilings
Flat white, rolled in one direction so the light does not show laps.
Trim and doors
Satin or semi-gloss, brushed after a light sanding.
Kitchens and baths
A washable, moisture-resistant sheen for the rooms that steam.
Questions
About a unit repaint
How long is a unit out of use?
A typical one- or two-bedroom flat takes about four working days. A studio is quicker and a large flat takes longer; your estimate gives the days for your unit.
Do we need to empty the unit first?
No. We can paint around furniture and covered boxes, but a bare unit goes faster, and the estimate says which one it assumes.
Who picks the color?
You do, or we use an off-white we keep for turns. Painting everything one off-white across a building keeps the next touch-up easy.
Do you fix plaster and ceilings?
Yes. Cracks, small holes and water stains are repaired and sealed first. A ceiling that is still wet or soft needs the leak fixed before we paint, and we say so.
Is my building covered by the pre-1978 lead rule?
Many Chicago two-flats, three-flats and courtyard buildings were built before 1978. EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint in homes and child-occupied buildings built before 1978. Tell us the year when you text; our firm number is in the footer.
Send the unit, not a list.
Three photos give us what we need to tell you the days and what is in the estimate.